Analisa Sistem Antrian pada Stasiun Penimbangan di Pabrik Kelapa Sawit

Main Article Content

fitra lestari

Abstract

This study analyzes case studies in private companies engaged in oil palm fruit plantations and processing. This factory is located in the province of West Sumatra. Furthermore, at the weighing station in the factory there is a long queue, this is due to the large amount of fruit entering the company. The purpose of this study is to identify the activity at the weighing station to determine the total time, wait time, number in, number out and utilization level using the discrete event simulation method. The results of this study note that the average total time is 0.048 hours, the wait time is 0.0263 hours, the number in is 757 transport vehicles, the number out is 755 transport vehicles and the utilization rate, busyness and scheduling are 0.6671. Based on these results, the proposed improvement is carried out at the weighing station by increasing the working hours at the weighing station which was 7 hours in 1 day to 8 hours in 1 day

Article Details

Section
Articles